FISCAL BENEFITS 80% Depreciation in the first year of operation. 10-year Income Tax holiday on income from wind power generation. The cost of power production is very low. USAGE Power Generated can be used for following purposes has specified by State Electricity Boards (SEB) Consumed for own purposes anywhere in the State. Sold to the SEB WHEELING Power generated can be 'wheeled' through SEB's grid and same can be consumed under captive consumption anywhere inthe State. BANKING Power generated can be 'Banked' with the SEB's grid and same can be used for consumption at a later day, as specified by SEB. LOWEST GESTATION TIME Wind farms can be commissioned by NEPC within 3 to 4 months from the date of signing the MOU on a turnkey basis. ECO FRIENDLY AND SAFETY Say Good bye to heat, dust, odur, sound, fumes, mishaps etc... LOWEST OPERATION AND MAINTENANCE AND COSTS The Operation is cost is the lowest and the cost of generation reduces since there is no input cost and the expenses or on insurance and nominal O&M charges. |
|||